STÁTNÍ TAJEMNÍK U ŘÍŠSKÉHO PROTEKTORA V ČECHÁCH A NA MORAVĚ, PRAHA, inv. 1699, sig. 109-4/1454 Page 8 · 8 of 21
STATE SECRETARY FOR THE RUSSIAN PROTECTOR IN CHEIN AND MORAVA, PRAGUE, inv. 1699, sig. 109-4/1454
English Translation
6a --2-- As the total of approximately 2 7oo ooo, RM is estimated, a 60% percentage of the total amount is calculated; however, a 70% completion can be assumed in terms of work, since the rest of the work requires more costs of building materials than of labour force. 3.) Building materials The following residual requirements have been fixed for used building materials: the existing stocks of cement and iron have been delivered on a provisional basis after the closure of the building. (b) Heating 13 t c) Ventilation 65 t 122 t Machine iron: a) Lifts 6 t b) Boiler system (5 boilers) 47 t 53 t Cement: a. Masonry and concrete work 215 t b. Wall tiles 165 t c. Floors (shamotte) 175 t d) Other (can be temporarily saved) 305 t 860 t Brick ....... . 160 000 p. 200 m 3 Asphalt ............ 15 t If the building is to be used for a different purpose (administrative buildings), various building changes will be required. Thus, the artificial ventilation system will be unnecessary, the wall cladding will almost completely disappear. Instead of the intended chamotte pavement, wood floors will usually be installed in the rooms, and ready-to-use work (seheid walls and leitums) will also be modified 7839 3