In any case, a saving of iron and cement will occur in comparison with an increase in the demand for wood. Presumably, the demand should adjust as follows: Baueisen Maschineneisen Cement Holz 57 t 53 t 350 t 600 m^33}$ Construction costs should be reduced by approximately 2oo ooo,- RM. 4.) Labour input For the completion work 16 ooo construction workers- Tagewerke are expected to be necessary, the work performance of the skilled craftsmen is not included. Therefore, at a level of 5o construction workers the construction time would require 1 full year. B. Nursery School Die im Schr. St. IV O - 736/42 v. 16.1.43 a secondary school is an independent building with the main front against Karlsplatz, which only has a single connection with the building complex of the polyclinic in the l.Stockwerke, in the other floors a connection can not be achieved due to different floor heights. This building has a basement and 6 floors above the earth. For office purposes, the building is very suitable. The currently planned two 1 1/2 floor high classrooms can be eliminated by replanning, since the construction has not yet progressed to this height. The converted room of this building is about 2o ooo m3. This building is only concreted in the reinforced concrete rib up to the 1st floor ceiling and is still in formwork. It is therefore only installed to a quarter of the total amount planned with approximately 1 5oo ooo, RM. The following materials are required for the manufacture of building materials: 130 t Zenent 400 t wood 300 m^3}$ Asphalt 12 t The heating is provided in the same way as in the building of the polyclinic, but is fed by the boiler installation, so that a separate boiler system is omitted.