GERMAN STATE MINISTRY FOR CHECH AND MORAV, PRAGUE (1906) 1939 - 1945 (1965), inv. 476, sig. 110-4324

Page 44

English Translation

- 3 28 19.3.45: Route Wall.Meseritsch-Hullein blasted at 02.40 am between Rai-nowitz and Osichko railway bridge. Traffic interrupted. Duration of damage repair about 4-5 days. Distance not guarded. 19.3.45: Btrecke Deutsch Brod-Brünn at 23.15 a.m. Goods train 7l14 derailed.At km 3l,5 connecting flaps on the track by ban- diten unscrewed.Locomotive and 8 wagons embankment down. Distance not guarded. 20.3.45 : Line Proßnitz-Zbel between the stations Proßnick Local bhf. and Kosteletz Rail screws 7.5o m solved. Around Ol,27 derail train no.83oo with locomotive and other trains. 2 wagons. Goods traffic stopped. Travel traffic maintained by changing. Route not guarded. 21.3.45: Route Wall.Meseritsch-Mähr.Weifkirchen: Interruption of the telephone line. 6 telegraph poles cut off by bandits at station Hustopetsch. Line wires torn. Interrupted communication. Route guarded by V.St.Btl.33. 21.3.45: Route Mähr.Ostrau-Friedeck between Moravian Ostrau-Gr.Kunzen-dorf at km 4.3 all 32 telephone lines demolished.It is around Bahnfrevel. Route guarded by Gend.Landes- Kommando Mähren. 21.3. 45: Route Wall.Meseritsch-Wlarapasse V.St.-Streite called and shot at. Countermeasures initiated by hunting train in Ober- Litsch. 22.3.45: Route Proßnitz-Mähr.Trübau between Kosteletz-Ptin at 4.50 am at km 8.4-5 solved rail threshold screws determined by track runners.No consequences for the operator operated. Route unguarded. On 2 19.3.45, the Volkssturmmann Anton Prybl - 1./V.St.Btl.33.7 Deiilje thlers 00-00r e ( Ahlers ) Gebeim So ua ua a an le.