GERMAN STATE MINISTRY FOR CHECH AND MORAV, PRAGUE (1906) 1939 - 1945 (1965), inv. 932, sig. 110-8/4

Page 8

English Translation

Division VIII,5 Building Prague, 24 February 1944 Minl To the 25th FEB. 1944 Mr. Head of the Ministry in the H a u s e Subject: Porter's house at the apartment of the Minister of State; Reference long-distance call of 23rd D.M. Yesterday I visited the works of the above building. Those works that can still be completed during the frost will be completed on Saturday, 25th D. M. During frost it is not possible to finish the final roofing (the roof is provisionally covered with roof-papper) and the exterior plaster. In addition, the interior painting can only be installed after drying out the walls. There is still no connection of the electric light line, since a cable still has to be created. A model of the weather flag was installed this afternoon. Commissioned by: Bollachn. din ogang 1eJ2 / 26/ 2.44. St.M. VMA-4/44