STÁTNÍ TAJEMNÍK U ŘÍŠSKÉHO PROTEKTORA V ČECHÁCH A NA MORAVĚ, PRAHA, inv. 2121, sig. 109-8/4 Page 219 · 219 of 268
STATE SECRETARY FOR THE RUSSIAN PROTECTOR IN THINGS AND IN MORAVA, PRAGUE, inv. 2121, sig. 109-8/4
English Translation
113a318 Order of the Chief of the Polish Republic and SD. No. 19/42 Content — Very detailed information on the published RdErl is given. - Security police and SD, Rd Erl. 27. 4. 42 Building-screment-Reichskriminalpolizei. Rd Erl. 14. 4.42 Crimea.Pol. kungen. p.118. - RdArl.27.4.42 Travel for reporting service. p. 119. - RDErl. 23. 4 42 Orbital Pentecost, p. 118. -RdErr. 1.5.42 Confiscation of personal files of the Krim.pol. Content I. d. Purposes of documents which are not included in the list of criminal biological genera. p. 119. (i) the competent authority of the Water Protection Police Command, loss of an identity card, p. 120. 'Elbe'. p. 119. Staff communications, ps 120. Security police and SD building restrictions. 5. In all cases in which exceptions or classification in emergency cases of the RSHA of 27.4.1942 are to be applied for, I shall have the right to — II C 3 No. 578/42 — as already announced in the daily press a the construction office cost estimates with construction, the construction restrictions with effect from the explanatory report (construction description) and construction 15. 4. 1942 have been considerably tightened. Section I drawings, of the RdErl. of 7. 6. 1940 (comm. (c) an opinion on whether the necessary work is available with a construction cost up to a staff of 5000 RM. However, they also have the approval of the employment office and the provision of 6. Also approved buildings must be limited to the minimum required volume of building materials. The construction itself has to be carried out in the simplest form. All the exceptions granted so far must be observed in every respect, all not have lost their goodwill on 15. 4. 1942. The conditionally necessary expenses for out-work had to be avoided until this time, etc., and permanent construction methods to be replaced to a large extent by temporary construction methods. 3. Construction projects with a 5000,— RM exceeding security police and SD. - Order form p. 118 Construction costs may only be taken into account after prior consent of the territorial officials of the GB-Construction. The granting of new exemptions can only be done in the intra-travel at Pentecost. The General Plenipotentiary RdERI of the RFüuChdDtPol. in the RMdI of 27.4.1942 for the regulation of the construction industry Reichs- — S I A 1 a No. 298/42-360-4 — Minister S pe r has reserved for himself the grant of the following RdSr. of the Reichsvernahmenverlaubungen, which is granted to him by the Minister of Foreign Affairs and Director General of the Dt. In addition to the detailed consideration of the implementation of the provisions contained therein, all departments of the "Seich.Pol. u. der SD" (Pol. & SD) may carry out the maintenance and repair work on the basis of explicit authorizations to the Pilicht. The area officials are instructed to release only those works which cannot be omitted for the maintenance of a business, for the avoidance of attachment: of dangers etc. Beauty repairs are not acceptable in any case The Reichsverkehrsminister. To the extent that the subordinate and general director departments apply for derogations from the relevant district regulations of the Deutsche Reichsbahn, 20 Bfsf 192 Berlin, 16. 4. 1942, my consent must be obtained beforehand. Subject: Travel at Pentecost. 4. In addition, if construction projects are to be included in the dring (1) As a result of the continuing strong list of war-related buildings, which will make it impossible to grade locomotives, the corresponding wagons and railway personnel will be submitted for additional applications by the RSHA.