THE SECRETARY TO THE RUSSIAN PROTECTOR IN THINGS AND IN MORAVA, PRAGUE, inv. 1364, sig. 109-4/1118

Page 10

English Translation

Four examples form a section in which an older experienced engineer (in line with the RAB's roadway construction) and the authorities of the unemployed carry out the supervision of the construction of the smaller bridge buildings, Fir is responsible for the construction management of a special bridge group department, while the Directorate General carries out the construction supervision of viaducts and large bridge objects through its own bridge construction group. After the declaration of the Protectorate of Bohemia and Moravia and after the councillors with the Inspector General for the German Roads in Prague, there were no major organizational changes and the Directorate General works as a department of the Ministry for: public arteites in the Protectorates in a similar composition as before. On 27 March 1939, the Inspector General for the German Road Sector sent his representative to the Directorate-General for the Construction of Motorways in Prague, which is also responsible for motorways at the Reichsprctektor for Bohemia and Moravia. In this way, close cooperation with these places is ensured.In addition, the experiences gained during the construction of the Reich motorways are exploited. An important departure from the state-law change of March l6 9s9 was that the Directorate-General for the selection of its personnel military technicians (engineering officers) from the liquidating power of the former republic, as well as technical