OEE 0 ground floor), which has led to an extension of the original construction plan, which must be carried out under all circumstances, since, according to the current state, there is a risk of safety within the building. The development of the exemption for these additional works depends on the port of construction being carried out and therefore on the timely completion of the conversion process. The planning of the Podiebrad Castle was carried out, while the inspection of the German home schools by the Heten Reichsminister Speer was promised that the food building materials would be allocated from a special quota The first phase of construction, which is to be carried out without quotas, was - in order to prepare a tefl of the new castle by the beginning of the nete school year, on 15.3.1943 for the exemption - D g eTO The former Czech Realgymnasium for the accommodation of 6o young men was to be prepared for the construction of a nesting site in Kuttenberg instead of the Jesuit College, which was planned for later on. As I am aware, the inspection of German home schools is expected to take place at the beginning of the new school year and, if children from bomb-damaged property were to be admitted to these institutions, it would be necessary to grant the most necessary quantities of iron to sanitary facilities if they were not available for podiebrade to the exploratory quota. A corresponding reference to the site representative for the regulation of the construction industry would allow me to carry out the tasks provided at the time desired by the inspection of the home schools.