STÁTNÍ TAJEMNÍK U ŘÍŠSKÉHO PROTEKTORA V ČECHÁCH A NA MORAVĚ, PRAHA, inv. 2753, sig. 109-14/56 Page 117 · 117 of 252
STATE SECRETARY FOR THE RUSSIAN PROTECTOR IN THINGS AND IN MORAVA, PRAGUE, inv. 2753, sig. 109-14/56
English Translation
137 mic 2./3. V. B e r i c h t on the continuation of the preparatory work for the maintenance of the protective road II. Class Lodenitz - Karstein. The construction of half of the wooden barracks in Loderitz is continuing and is about to be completed immediately. The components of the remaining half of these barracks are currently being moved to their new destination near Karlstein. The transport of the mentioned material takes place with 2 5-tons of motor vehicles on wood gas transmission. Furthermore, reference is made to the IVth report of February 23, 1942. In Morschin, a favourable result was obtained, according to which the production of the 4,00 m sighthotter seems possible in 80 working days. Should the necessary auxiliary workers be assigned by the employment office in Berun, there would be no obstacle to the intervention of the workeh in the said stone broth. In the Solway-EmlM works quarry to be leased to the building administration, the storage of the rock has such severe faults and both shift shifts that both the use of the compressor and the stone crusher would be superfluous as a result of the loosening of the stone. For this reason, it will be possible to produce dcd sr d d d c d ds on a manual basis, but this will require the allocation of a corresponding number of auxiliary workers. The crossing at Kosolup will begin immediately after the snow melt, with the help of 60 to 80 workers of the Arity Camp. At the same time, two workers will be assigned to the local road guards in order to: