STÁTNÍ TAJEMNÍK U ŘÍŠSKÉHO PROTEKTORA V ČECHÁCH A NA MORAVĚ, PRAHA, inv. 2753, sig. 109-14/56 Page 101 · 101 of 252
STATE SECRETARY FOR THE RUSSIAN PROTECTOR IN THINGS AND IN MORAVA, PRAGUE, inv. 2753, sig. 109-14/56
English Translation
1 July 1942 III/5 - 7582 .124p Gesc Gel Exp. 14 1517 WW .1) To Mr. ober-RegvRat Dr. G i e s in the Czernin-Palais Subject: Road construction Lodenitz-Karlstein Reference: Your letter v. 9.7.l942 - St. S. IV K - 12 c/ 41. Supplements: - Jashrualgcug6- Despite the transport difficulties, the work on the Hersteliung-of the street Lodonitz-Karlstein could be promoted to the extent that the local relocations and improvements in the course of the road to the production of a new bridge in Bubowitz are before completion. The above mentioned bridge is expected to be accessible during the course of this month. After the delivery of the stone material was secured, the production of the deck was started on 5.6. The completion of the entire 3 km long rolling is certainly to be expected on l8.7. After rolling, the application of a surface treatment is to be carried out by means of a tea spread. As far as the distance is in steep gradient, a continuous treatment with chlorine calcium is planned for the purpose of dust prevention. If the material required for surface treatment (teer, ralzium, splitt) is not expected to be completed by the end of August at the latest. The ancillary work, such as the installation of the necessary edge protection, the setting up of trenches and banquets, the establishment of traffic signs, etc., will be carried out immediately following the completion of the rolling. At the same time as the road was repaired, I also ordered an improvement in the access path from the Protektoratsstrasse to the entrance to the castle.