THE GERMAN STATE MINISTRY FOR CHECH AND MORAV, PRAGUE (1906) 1939 - 1945 (1965), inv. 122, sig. 110-3/62

Page 105

English Translation

1Yes - 2 ginnen, in which the old works are connected by tank and combat graves. At the beginning the city's classification for sectional defense is to be carried out. After completion of this work the Aussanring has to be expanded. 2.) As a construction instruction for the F.stungekomandanten, Vfg. OkH/Gen d Pi u Fest/Abt L Nr. 12 200/44 soh. of 1.l2.44 is sent. 3.) As a total crew 2 Divisionan pregasshen. b) rest Brünn l.) OkH with the proposed line guidance sinvaretanden (see Appendix 2), 2.) The Panzarhindernis in system the outer ring is to be pulled through. The Panz xhindarnis must be placed basically behind the 2nd trench. As a rule, the type of fire can be placed behind the tank barrier. Expansion of čes Fe:tungskernes, is planned in accordance with the old fortress Spialbeig. 5.) Vig. Gen d Pi u Fest is sent as a construction instruction for the fortress commander in Okh/Abt L Nr. 12200/44 go. voi 1.12.44 4.) As a garrison 3 divisaons are provided. IV.) Fortifications for Olmütz uid Brunn were named by OKH ... V.) Messages by commander the Fächtungs jereiches Südost gamüß Vfg. OKH/GanStdH/Gen d Pi u Fast/Op Abt/Abt ds Baf Nr. l2 987/44 g.K. of 11.12.44. gez-t G u d e r i a n Ganeralobd:st and Chief of the General Staff of the Haeres For accuracy: Pliilt 40316 Oberstlti.G: - 3 -