THE GERMAN STATE MINISTRY FOR CHECH AND MORAV, PRAGUE (1906) 1939 - 1945 (1965), inv. 94, sig. 110-3/34

Page 48

English Translation

(a) by Pz.AOK 4: I and IV Turkarbeitsbrigade.- Parts He.-Bau-Pi.-Brigade 155; (b) by AOK 17: Pi-Sperr-Komp.912; (c) by Höh.Pi.Kdr.1: Hoh.Ld. Bau-Fue 8.-Pi-Spezialstäge 4 and 75. - Einrichtungsabteilung 1037, 1053, 1060. 4•/He-Bau-Pi- Brigade 155: d) of OT liaison leader: 1 superconductor of the special unit Watzke as technical staff. Feeding must be regulated in direct agreement with the participating departments. The parts of He-BAU-Pi Brig.155 must be moved to Jungbunzlau. A possible subordination of parts of the OT-Brückebau-regiment 80 is still under command. It is necessary to present a proposal on the planned restructuring. 5.) Extension of the restricted zone. First of all, the main roads must be sped up. They must be kept open in a width of 4.50 m as far as two-way, 6 m wide, so far double-way. Map with a drawn road network is sent. Proposals for amendments or additions shall be submitted. (a) in addition to each existing road bridge over the Elbe, a war bridge point of 8 tonnes and a ferry point of 24 tonnes must be explored, including access and departure routes; (b) a 7o t major ferry point must be set up at Königgrätz, Pardubitz, Ko-lin and Altbunzlau, and arrivals and departures as well as by-passing the cities, if necessary, must be determined and signposted. (a) to the 10.3.45 submission of a blocking plan, classification of the Qber sections and the use of forces;