THE SECRETARY TO THE RUSSIAN PROTECTOR IN THINGS AND IN MORAVA, PRAGUE, inv. 1378, sig. 109-4/1132

Page 5

English Translation

Copy. The Imperial Protector Prague, July 14, 1942. in Bohemia and Moravia Group Road Construction No. III/5 An Ob im Be Vo Beilg. - Despite the transport difficulties, the construction work on the road Lodenitz-Karlstein could be promoted to the extent that the local relocations and improvements in the course of the road, except for the construction of a new bridge in Bubowitz, are about to be completed. The above mentioned bridge is expected to be accessible later this month. After the delivery of stone material was secured, the production of the top layer was started on 5.6.. The complete 13 km long rolling can be expected to be finished with certainty on 18.7.. Jm connection to the rolling is to be done with the application of a surface treatment by tea coating. As far as the distance is on a steep slope, a continuous treatment with chlorine calcium is provided for for the purpose of dust binding. If, when transporting the material required for surface treatment (tea, chlorcalcium, splitt) is not necessary in August, I have the protectorate