STATE SECRETARY FOR THE RUSSIAN PROTECTOR IN THINGS AND IN MORAVA, PRAGUE, inv. 1297, sig. 109-4/1051 (damaged)

Page 8

English Translation

-3- A temporary improvement of the Wasseknappheit in Kladno would be possible by connecting the water pipe in Masshaupt to the water line in Klatno, since the water supply so far has a surplus. The solution would be possible without any particular difficulties, it is only necessary to connect the tower holder in Masshaupt with the one from Kladno by a pipe about 2300 m long- the The government commissioner of the city of Gross-Kladno Dr. To c k e r is ready to carry out this project, but to do so needs an authorization from the Commissioner for the regulation of the construction industry for the release of the labour force and the material. The execution would require a maximum of three months. Prague, March 5, 1943. Hy. Tilenol.